| Date | Revision |
| 5/4/2023 | 1. Completion of draft document. |
| 6/23/2025 | Permitted Equipment Guideline: Clarified, separated and defined Designated Trainers vs. Designated Evaluators |
| 11/10/2025 | Added new labeling requirements for small and very small containers per changes to the MIOSHA HazCom Standard. This aligns MIOSHA’s rules with OSHA and the United Nations’ Globally Harmonized System of Classification and Labelling of Chemicals (GHS), Revision 7, effective Aug 12, 2025. |
| 12/18/2025 | Added Section 37.0 Engineering Controls Certification and Maintenance |
| 12/18/2025 | Added Circuit Breaker Policy to 10.0 Electrical Safety Program |
| 1/14/2025 | Hot Work Permit Update Updated the HWP at the request of our insurance company FMGlobal. Updates included: – Increasing the hot work monitoring period from 30 to 60 minutes. – Added a storage/warehouse space with combustibles definition – Added a two hour monitoring period for the storage/warehouse scenario. – Reviewed our permit to ensure it met the latest 2024 NFPA 51B, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING, AND OTHER HOT WORK. |
| 2/26/2026 | Added AED/CRP requirement to the EEWP |
Research & Clinical
All University of Michigan faculty, staff, other employees, and students conducting research, regardless of location or working in academic shops and studios are responsible for the safety of themselves as well as those working around them.