Asbestos and Lead Survey

Asbestos and Lead Survey

The following form is to be used when requesting air monitoring services during asbestos abatement projects (regulatory requirement for all asbestos abatement projects), or when requesting a building materials survey prior to the beginning of a renovation or demolition project.

For air monitoring, requests should be made at least 48 hours in advance if possible. For building materials surveys, requests should be made 10 or more business days (2 weeks +) prior to the date results are needed. For emergency air monitoring during damaged asbestos cleanup, or for smaller renovation projects requiring faster survey result turnaround times, please call (734) 647-1143.